Technical Case Studies

Client Kent Community Health NHS Trust
Funder Client
Year 2013
Role Contract Administrator and Quantity Surveying
Location Jubilee Way, Eurocentre, Faversham
Project Brief

Dental workshop and storage fit out, including new partition and internal door on ground floor; dot and dab existing ground floor block walls, including 3nr cleaning areas/whiterock finish with multi point hot water provision, lighting and heating on ground and first floor; light industrial concrete paint floor finish and vinyl floor finish in disabled toilet.

Client George Wilson Holdings Ltd.
Funder N/A
Year 2013
Role Project Manager
Location Herne Bay, Kent
Project Brief

Provided project management services for the delivery of a new office fit-out, comprising three dedicated office suites with mechanical ventilation. The project required a fast track programme to ensure that the clients were able to move in on the specified date. 

Client Brockhill Performing Arts School
Funder N/A
Year 2012/13
Role CDM Coordinator
Location Hythe, Kent
Project Brief

Martello Building Consultancy were appointed to provide CDM Coordinator services in partnership with architects Conker Conservation Ltd, Canterbury. 

The works were comprised of the refurbishment of an existing classroom within the farm complex of Brockhill Performing Arts College, which included re-cladding, re-roofing and internal works.

Client Abbots Court Developments
Funder N/A
Year 2012
Role Cost and Building Consultancy
Location Hoo, near Rochester, Kent
Project Brief

Provided cost and building consultancy for the construction of eleven new stylish homes for private sale. The project was a refurbishment of a historic building, dating back to 1313 and was most recently used as a care home. The scheme was also followed and televised by the popular BBC programme, Homes under the hammer.

Client BW May & Sons Ltd.
Funder English Rural Housing Association/HCA
Year 2012
Role Design Co-ordinator: working with the Main Contractor's designers, to ensure that the Employers Requirements design standards were achieved
Location Ruckinge
Project Brief

The construction of 6 new homes, which achieved Code for Sustainable Homes level 4. The new homes were built with timber frame construction, designed to an air permeability rating of 3 m3/(h.m2).

The main source of heating was ground source heat pumps, which was complimented with mechanical ventilation with heat recovery system.
Client Orbit Homes
Funder HCA
Year 2012
Role Building and Quantity Surveying
Location Thanet
Project Brief

Martello Building Consultancy undertook a robust survey on a number of empty homes, in the Thanet Area, for a future refurbishment programme. The surveys had to take into account Housing Quality Indicators, Eco Homes, and Building Regulations requirements. The survey reports also provided an indicative cost plan for the likely refurbishment costs.

Cookies

This site uses cookies. Some cookies are essential to ensure our website works for you in the best possible way. You may delete and block all cookies from this site, but parts of the site may not work. To find out more about cookies on this website and how to delete cookies, click here to see our cookie statement.